IcopalRoofDesignjpg

Monarplan Suitable Substrates

The load bearing structure must comply with all associated national standards and regulations, ensuring that the load bearing capacity is sufficient for any additional loads imposed upon the construction. It is important to consider the possibility of future deflection of the construction when designing roof drainage.

Substrates must be strong enough to permit the penetration of fixings whilst maintaining suitable pull out strength. It is recommended that pull out tests are conducted prior to the application of the Monarplan system (see below).

Acceptable substrates

The Monarplan Roofing System can be installed on new construction or over existing roofs, when the existing roofing assembly is dry or the wet areas have been removed and replaced; or when the existing roof is completely removed to the deck. The roofing contractor has the final responsibility of acceptance of the surface to receive the roofing system.

The following structural substrates are acceptable for the Monarplan PVC Roofing System:

 

Profiled Metal

 

Plywood or OSB

 

Timber Boarding

Substrate Metal 175   Substrate Ply OSB 175   Substrate Timber Boards 175

Structural Concrete

 

Other Substrates

 
Substrate Concrete 175   Substrate Concrete 175  
    Contact Us

    Contact Us

    +421 36 756 39 47

     

    skism@icopal.com

    01908 015760
    (UK office)

     

    Latest News

    Standard Industries Completes Acquisition of Braas Monier to Form Global Roofing Leader

    Read more

    Icopal is now part of the GAF family

    Read more

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser